Workspace

ready to fit workspace 

creative

space plan

total workstations = 150

127 x open plan desks

30 x alternative workstations

density

1 : 10 sq m

  • 2 x 12 person meeting rooms
  • 2 x 8 person meeting rooms
  • 4 x 6 person meeting rooms
  • 2 x 4 person meeting rooms
  • 2 x training rooms
  • 2 x informal meeting areas
  • 4 x phone booths
  • hub / kitchenette
  • comms room
available space

not to scale — indicative only

total workstations = 157

127 x open plan desks

30 x alternative workstations

density

1 : 10 sq m

  • 2 x 12 person meeting rooms
  • 2 x 8 person meeting rooms
  • 4 x 6 person meeting rooms
  • 2 x 4 person meeting rooms
  • 2 x training rooms
  • 2 x informal meeting areas
  • 4 x phone booths
  • hub / kitchenette
  • comms room
available space

not to scale — indicative only

occupancy
    Air Conditioning
  • Fresh Air Provision: 12l/s per person @ 10m 2 / person
  • Cooling Provision: 10m 2 / person with an additional 10W/m 2 available via chilled water circuits for future tenant enhancements
    Lifts
  • Capacity is provided via 3 x 1,000kg / 13-person passenger lifts located in the central atrium
  • Good’s lift capacity: 13 persons / 1,000kg
    Toilet Provisions (building wide)
  • Toilets are accessed via communal lift cores on each level
  • The provision across the whole building at an occupancy of 10m 2 / person inclusive of accessible WCs
    Means of Escape
  • Level 1 and Level 2: 6.25m / person
  • Further details are set out in the fire strategy review by Fire Engineers JGA Jensen Hughes dated March 2021, available upon request
air conditioning
    Draft Specification
  • Return perimeter heating, chilled water pipework and displacement systems for open plan configuration.
  • Perimeter heating consists of trench heaters, LPHW pipework and 2-port motorised valves serving each zone (4 zones)
  • Air displacement systems comprise supply air ductwork extending out from each core and aluminium floor swirl diffusers within the raised access floor
    Control of Displacement System
  • All air ventilation system that provides cooling and ventilation is served by four air handling units at roof level
  • These feed dedicated supply and return air ductwork within each core riser.
  • The supply air is discharged into the pressurised floor plenum and exits via adjustable swirl diffusers.
  • The distribution of air from each air handling unit is split by floor void barriers.
  • Space heating is via a perimeter heating system, fed from flow and return LPHW pipework distributed in the floor void to each trench heater
    Design Criteria
  • Internal Winter Condition: 20 o C +/- 2o C
  • Internal Summer Condition: 24 o C +/- 2o C
    System Hours of Operation (core hours)
  • 7am to 7pm Monday to Friday exc. bank holidays
    Control (BMS)
  • The building wide Heating Cooling + Ventilation system is controlled by a central BMS (Trend IQ Vision System) with head end located within the Landlord’s Area
  • This regulates the thermal comfort levels on each floor automatically, responding to changes in outside ambient and on floor temperatures
  • A single space temperature sensor is provided to each zone of perimeter heating
  • The Trench heater branch valves are modulated via a PI control loop from the BMS to maintain the space temperature set point
  • The perimeter LPHW valves are enabled when the temperature drops below the designated floor area temperature set point and also in an Optimizer Heating Boost condition, Frost condition and during a Valve Exercise routine
electrical
    Small Power rate per m2
  • Small Power (BCO) 2019 is 20W/m2
  • Lighting (BCO) 2019 is 8W/m2
  • Spare capacity on the floor is 5W/m2 small power and 7W/m2 lighting
    Mechanical Services rate per m2
  • BCO 2019 is 5W/m2.
lighting
  • Lighting to the open plan office floor comprises LED 45 Lichtkanal recessed fittings supplied by Fagerhult
  • Lighting control is using the Fagerhult “Organic Response Technologies” system with each linear run incorporating a control node which houses motion, infra-red, and BLE sensor
  • Lux Level are 300-500 lux at desk level. Emergency lighting when operated will provide 0.5 lux
finishes
    Office
  • Perimeter walls: painted plaster – white RAL 9003
  • Ceilings: painted plaster – white RAL 9003
  • Perimeter includes full height glazing with blinds to the building exterior
structural grid
  • The building is set out principally on a 7.5m x 7.5m and 7.5m x 6m grid
floor loading
  • Typical floor loading is 5 kN/m2 (4.0+1.0 partitions) live load
  • Superimposed dead 1.0 kN/m2 (raised floor and services)
floor & ceilings
  • Floor to ceiling height is 2,835mm
  • Existing raised floor has an overall build-up of 445mm, tile thickness is 35mm, Service void is 415mm
passenger lifts
    Lift speeds
  • 1.6m/s
    Finishes
  • Metalwork PPC RAL 9005 30% gloss
  • Walnut fluted panel
  • Silver mirror panel safety backed
  • Port 4 destination control
sustainability
  • Ska Gold Certification
  • EPC Rating B
building security
    The on-site team at Wells & More (45 Mortimer Street) includes
  • Occupier Services Manager and FM resource (cleaning / maintenance);
  • Reception service during core office hours; and
  • 24-hour security
other information
    No. of cycle spaces
  • Two tier rack spaces: 30
  • U shaped stands: 8
    No. of lockers
  • Service yard: 42
  • Male area: 30
  • Female area: 32
    No. of showers Male and Female
  • Male area: 3
  • Female area: 5